Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| wiki:site_notice [2011/03/11 12:55] – [European Project Semester at ISEP - EPS@ISEP] epsg2wiki | wiki:site_notice [2014/07/23 20:22] (current) – team2 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== EPS Project Documentation - group 2 ====== | + | //**European Project Semester at ISEP - EPS@ISEP**// |
| - | + | ||
| - | ====== | + | |
| - | This is the electronic logbook - group 2. It should be updated every week to introduce the weekly report, specify the agenda of the next meeting and write the minute of the last meeting. | + | |
| - | ==== Project Title: ==== | + | |
| - | Humidifier with a Web Interface | + | |
| - | ==== Project Summary: ==== | + | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | The goal is to develop a humidifier with a Web interface for a server room of 80 m³. | + | |
| - | + | ||
| - | The final product must: | + | |
| - | - maintain of a relative humidity between 40 % and 70 % (+- 5); | + | |
| - | - distribute the generation of water vapour within the room; | + | |
| - | - have two days of autonomy; | + | |
| - | - be placed on the floor of the room; | + | |
| - | - include water and humidity alarms; | + | |
| - | - have on-off switch; | + | |
| - | - be compliant with the EU Directives 2006/42/CE 2006-05-17 and 2006/95/CE 2006-12-12; | + | |
| - | - have a composite material structure to hold the control unit and the water container; | + | |
| - | - include a life-cycle analysis; | + | |
| - | - use open source technologies. | + | |
| - | + | ||
| - | ==== Participants: | + | |
| - | Institution: | + | |
| - | + | ||
| - | Group:2 | + | |
| - | + | ||
| - | Students: | + | |
| - | * Fatima Leal | + | |
| - | * Marc Ribas | + | |
| - | * Mihaly Varga | + | |
| - | * Mateusz Malkowski | + | |
| - | + | ||
| - | Supervisors: | + | |
| - | + | ||
| - | * Betina Campos Neves (bbn ' | + | |
| - | * João Francisco Silva (jfs ' | + | |
| - | * Manuel Santos Silva (mss ' | + | |
| - | * Maria Benedita Malheiro (mbm ' | + | |
| - | * Nídia Sá Caetano (nsc ' | + | |
| - | * Pedro Barbosa Guedes (pbg ' | + | |
| - | + | ||
| - | Client: ISEP's Data Centre | + | |
| - | + | ||
| - | * José Barros Oliveira (jbo ' | + | |
| - | + | ||
| - | ==== Documentation ==== | + | |
| - | Work plan: | + | |
| - | Deliverables | + | |
| - | Tasks | + | |
| - | Gantt chart | + | |
| - | + | ||
| - | Logbook: | + | |
| - | Weekly Report | + | |
| - | Meetings | + | |
| - | Activities | + | |
| - | + | ||
| - | Report: Structure of the report | + | |
| - | + | ||
| - | Documents: Documents folder containing all deliverables | + | |
| - | + | ||
| - | ==== Contacts ==== | + | |
| - | 1) | + | |
| - | 2) | + | |
| - | 3) | + | |
| - | 4) | + | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||